![PES (ENEL GREEN POWER)1](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER1.jpg)
![PES (ENEL GREEN POWER)2](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER2.jpg)
![PES (ENEL GREEN POWER)3](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER3.jpg)
![PES (ENEL GREEN POWER)4](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER4.jpg)
![PES (ENEL GREEN POWER)5](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER5.jpg)
![PES (ENEL GREEN POWER)6](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER6.jpg)
![PES (ENEL GREEN POWER)7](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER7.jpg)
![PES (ENEL GREEN POWER)8](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER8.jpg)
![PES (ENEL GREEN POWER)9](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER9.jpg)
![PES (ENEL GREEN POWER)10](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER10.jpg)
![PES (ENEL GREEN POWER)11](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER11.jpg)
![PES (ENEL GREEN POWER)12](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER12.jpg)
![PES (ENEL GREEN POWER)13](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER13.jpg)
![PES (ENEL GREEN POWER)14](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER14.jpg)
![PES (ENEL GREEN POWER)15](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER15.jpg)
![PES (ENEL GREEN POWER)16](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER16.jpg)
![PES (ENEL GREEN POWER)17](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER17.jpg)
![PES (ENEL GREEN POWER)18](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER18.jpg)
![PES (ENEL GREEN POWER)19](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER19.jpg)
![PES (ENEL GREEN POWER)21](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER21.jpg)
![PES (ENEL GREEN POWER)22](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER22.jpg)
![PES (ENEL GREEN POWER)23](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER23.jpg)
![PES (ENEL GREEN POWER)24](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER24.jpg)
![PES (ENEL GREEN POWER)47](https://www.pugamujica.cl/wp-content/uploads/2017/06/PES-ENEL-GREEN-POWER47.jpg)
PES (Enel Green Power)BOP Gathering – Geothermal Plant, Cerro Pabellón
Construction and electro-mechanical assembly of the interconnection system between the different pits and the 50MW geothermal plant. Consists of the construction of stations for separation of solid materials, station for the re-injection and pumping of condensed material, plus 15 kilometers of pipeline to connect the plant and 6 extraction and re-injection pits. Project successfully executed in the Ollagüe area, that took 400,000 man/hours with staff working at 4,600 meters above sea level, in high mountain conditions, facing low temperatures and strong winds.
- Category
- Energy
- Year
- 2016
- Location
- Cerro Pabellón, Calama