


Collahuasi – BY-PASS línea de aguaFresh Water Line BY-PASS – Sector AAnillo Norte Rosario.
It consists of building and enabling new infrastructure associated with the tailings dam, which includes the installation of a buried pipeline with a 36” diameter and a length of 2.5 km, its connection to the existing 30” pipeline and wells MPT14, 17, and 18, as well as the installation of fiber optics, vent lines, and drainage systems for chambers, among other components.
- Category
- Mining
- Year
- 2024
- Location
- Collahuasi, Iquique, Tarapacá Region


Mechanical Assembly
