


Collahuasi – Línea Eléctrica 23kV23 kV Power Line Readjustment
It consists of relocating a section of the 23 kV power line that surrounds the Pampa Pabellón Tailings Deposit, through a bypass of the current line, which is conditioned by the future construction of the Northeast Wall. This power line has an approximate length of 3 km.



